Capital construction on the territory of “Coca-Cola” Kostinbrod

Capital construction on the territory of “Coca-Cola” Kostinbrod

Capital construction within the factory of Coca-Cola Kostinbrod – new neighboring site sewage, treatment plant reconstruction, additional technlogical facilities and others

Investor: Coca-Cola HBC Bulgaria“ AD            Completion date: 2015

Upon execution of the contract were completed feasibility studies, design, performance monitoring and commissioning into operation of various small projects in the factory. The more significant of which:

  •  New locker rooms for contractors performed based on the containers, fully equipped for this purpose
  • Conceptual design for “suspended ceiling ‘above production line
  • Construction of premises with charcoal filters
  • Construction of the foundation for two fructose tanks and installation of one of them
  • New 300 meters neighboring site sewage