The investment intention of BHTC to build an extension to the existing plant for the assembly of electronic controls for automotive air conditioning systems

The investment intention of BHTC to build an extension to the existing plant for the assembly of electronic controls for automotive air conditioning systems

The investment intention of BHTC to build an extension to the existing plant for the assembly of electronic controls for automotive air conditioning systems

Investor: BHTC

Area of the property – 69907 m2

Built-up area Extension – 5888.92 m2

Built-up area Shed for packaging – 106.8 m2

Total built-up area Extension – 6479.96 m2

 

The current project includes the implementation of the production hall with a warehouse and technical premises to it.

The building is provided with accompanying facilities, such as a canopy for storing packages, expansion of the existing fire tank with another wet chamber, a transformer station and technical premises for serving the warehouse

Most part of the building is one-storey, with the exception of the mezzanine located in the northwest of the production hall at level + 5.41m, as well as technical premises which are designed on two floors

Expansion of the building is separated from the existing building by a deformation joint. The construction of the building is made of prefabricated reinforced concrete elements. The distance between the columns is 20×18 m, optimal for the production line in the production hall